
- Status
- Ongoing
Highway and infrastructure contracting since 1992
CORRUGATED STEEL TUNNEL · SEISMIC RETROFITTING · TCDD
Line reinforced with ViaCon steel tunnel and stone retaining works.
STATION 01 Expertise
New road construction with earthworks, structures and pavement, plus completion and renewal works on existing roads.
Related projects
Repair of earthquake-damaged lines, including earthworks, structures and tunnel works.
Related projects
Excavation, support and construction works in urban road tunnels and railway tunnels.
Related projects
Stream and canal bridges, overpasses and link-road structures.
Related projects
Hot-mix asphalt (HMA) pavement, asphalt laying and traffic safety works.
Related projects
Drainage, shoring and retaining structures, landslide stabilisation and drinking-water transmission lines.
Related projects
STATION 02 From the field





STATION 03 Yeterlilik
STATION 04 How it is built
STATION 05 Evidence






STATION 06 Latest
The opening programme of the complex we built at Ahlatlıbel. With a 3,100 m² interior and capacity for 5,000 people, the mosque entered service together with a Qur'an school, a library, a foundation building and a condolence hall.
Other sources: Presidency of the Republic of Türkiye · Haber7 · Akşam
Our mosque page →The twin tube tunnel we built for Şahinbey Municipality opened to traffic on 16 March 2024. The journey between Şehirüstü Junction and Yeşilvadi Boulevard fell from 25 minutes to one.
Other sources: Directorate of Communications
Our news item →Use of cookies
This site uses essential cookies required for it to work. Optional analytics cookies are enabled only with your consent. Cookie Policy