EVIDENCE FILE
Projects
Every line is a contract, a route, a handover — with the employer, the tender number and the chainage.
-
Silifke–Mut Junction–Gülnar Road Pavement and Traffic Safety Works
Representative image
- Status
- Completed
- Employer
- KARAYOLLARI GENEL MÜDÜRLÜĞÜ MERSİN 5. BÖLGE MÜDÜRLÜĞÜ
Silifke–Mut Junction–Gülnar Road Pavement and Traffic Safety Works
-
Mut–Ermenek Road
Representative image
- Status
- Completed
- Employer
- KGM 5. Bölge Müdürlüğü (Mersin)
Mut–Ermenek Road
-
Bitlis Drinking Water Transmission Line
Representative image
- Status
- Completed
- Employer
- DSİ Genel Müdürlüğü
Bitlis Drinking Water Transmission Line
-
Fevzipaşa–İslahiye Railway Earthquake Repairs
- Status
- Completed
- Employer
- TCDD Genel Müdürlüğü
- Scope
- Earthworks · Engineering Structures · Tunnel · Earthquake Damage Repair
Fevzipaşa–İslahiye Railway Earthquake Repairs
-
Gülnar–Aydıncık Road and Gülnar Road Completion Works
- Status
- Ongoing
- Employer
- KGM 5. Bölge Müdürlüğü (Mersin)
- Route
- Km 0+000–50+384,03
- Scope
- Earthworks · Engineering Structures · Hot Mix Asphalt Pavement
Gülnar–Aydıncık Road and Gülnar Road Completion Works
-
Nurdağı–Hassa–Kırıkhan Road Completion Works
- Status
- Completed
- Employer
- VALİLİK (YİKOB) İÇİŞLERİ BAKANLIĞI MÜSTEŞARLIK-HASSA KÖYLERE HİZMET GÖTÜRME BİRLİĞİ
- Route
- Km 42+000–66+000
- Scope
- Earthworks · Engineering Structures · Hot Mix Asphalt Pavement
Nurdağı–Hassa–Kırıkhan Road Completion Works
-
Silifke–Mut Junction–Gülnar Road Completion Works
Representative image
- Status
- Ongoing
- Employer
- KGM 5. Bölge Müdürlüğü (Mersin)
- Route
- Km 0+000–50+384
- Scope
- Earthworks · Engineering Structures · Bridge · Hot Mix Asphalt Pavement
Silifke–Mut Junction–Gülnar Road Completion Works
-
Musabeyli–Kilis State Road
Representative image
- Status
- Completed
- Employer
- KGM 5. Bölge Müdürlüğü (Mersin)
- Route
- Km 40+350–57+620
- Scope
- Earthworks · Engineering Structures · Bridge · Hot Mix Asphalt Pavement
Musabeyli–Kilis State Road
-
Mardin–Midyat Road Completion Works
Representative image
- Status
- Ongoing
- Employer
- KGM Program ve İzleme Dairesi Başkanlığı
- Route
- Km 0+000–58+785
- Scope
- Earthworks · Engineering Structures · Hot Mix Asphalt Pavement
Mardin–Midyat Road Completion Works
-
Antakya Ring Road–Samandağ Road Earthquake Repairs
- Status
- Ongoing
- Employer
- KGM 5. Bölge Müdürlüğü (Mersin)
- Route
- Km 0+000–26+850
- Scope
- Engineering Structures · Hot Mix Asphalt Pavement · Earthquake Damage Repair
Antakya Ring Road–Samandağ Road Earthquake Repairs
-
Hatay Kanal 2 and Kanal 3 Bridges
Representative image
- Status
- Completed
- Employer
- KGM 5. Bölge Müdürlüğü (Mersin)
- Scope
- Engineering Structures · Bridge
Hatay Kanal 2 and Kanal 3 Bridges
-
Erdemli–Silifke–Taşucu Road, Aydıncık–Gözce Section
- Status
- Ongoing
- Employer
- KGM Program ve İzleme Dairesi Başkanlığı
- Route
- Km 153+000–178+158 muhtelif kesimler
- Scope
- Earthworks · Engineering Structures · Hot Mix Asphalt Pavement
Erdemli–Silifke–Taşucu Road, Aydıncık–Gözce Section